Sioux Chief 834 series Finish Line adjustable on-grade cleanout for heavy traffi c areas shall be used where necessary in drainage systems. Cleanout shall allow adjustment of 1.5" before the concrete pour, and 1.5" after the concrete pour. Scoriated cover shall meet applicable load requirements for intended use. Cleanout shall have a no-hub connection and include a slotted, polypropylene cleanout plug, situated in base adapter. Designed in accordance with ASME A112.36.2M-2002
Features:
- Adjustable AFTER the pour
- ABS/PVC Base Adapter with polypro cleanout plug, ABS Coring Sleeve and Head Adapter. Poly Coring Plug
- For use in pedestrian traffic areas